TLK1501EVM

Mfr. #: TLK1501EVM
Manufacturer: Texas Instruments
Description: Interface Development Tools TLK1501 SerDes Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TLK1501EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK1501EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Serializers / Deserializers type. Texas Instruments is a trusted brand for quality electronics 2.5 V, 3.3 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TLK1501EVM Image

TLK1501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK1501EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Serializers / Deserializers
  • Tool Is For Evaluation Of: TLK1501
  • Description/Function: TLK1501 serdes evaluatiom module (EVM) board is used to evaluate the TLK1501 device (VQFP) and associated optical interface (NetLight) for point-to-point data transmission applications
  • Series: TLK1501
  • Brand: Texas Instruments
  • Operating Supply Voltage: 2.5 V, 3.3 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TLK1501EVM

TLK1501EVM Specifications

TLK1501EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Serializers / Deserializers.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 2.5 V, 3.3 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top