TMP007EVM

Mfr. #: TMP007EVM
Manufacturer: Texas Instruments
Description: Temperature Sensor Development Tools Evaluation Module
Lifecycle: New from this manufacturer.
Datasheet: TMP007EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP007EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the IR Thermopile Sensor type. 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP007EVM Image

TMP007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP007EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: IR Thermopile Sensor
  • Tool Is For Evaluation Of: TMP007
  • Operating Supply Voltage: 3.3 V
  • Series: TMP007
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP007EVM

TMP007EVM Specifications

TMP007EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is IR Thermopile Sensor.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 3.3 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C, SPI

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Temperature Sensor Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top