TMP116EVM

Mfr. #: TMP116EVM
Manufacturer: Texas Instruments
Description: Temperature Sensor Development Tools TMP116 EVALUATION BOARD
Lifecycle: New from this manufacturer.
Datasheet: TMP116EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP116EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Temperature Sensor type. 1.9 V to 5.5 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is 0 C. Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP116EVM Image

TMP116EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP116EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Temperature Sensor
  • Tool Is For Evaluation Of: TMP116
  • Operating Supply Voltage: 1.9 V to 5.5 V
  • Series: TMP116
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: 0 C
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP116EVM

TMP116EVM Specifications

TMP116EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensor.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.9 V to 5.5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: At what frequency does the Minimum Operating Temperature?

    Q: The product Minimum Operating Temperature is 0 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Temperature Sensor Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

206 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top