TMP451EVM

Mfr. #: TMP451EVM
Manufacturer: Texas Instruments
Description: Temperature Sensor Development Tools TMP451 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: TMP451EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP451EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Temperature Sensor type. 1.8 V, 3.3 V operating supply voltage range Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, SPI Temperature Sensor Development Tools product type 1 of 100 Development Tools as subcategory

TMP451EVM Image

TMP451EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP451EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Temperature Sensor Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Temperature Sensor
  • Tool Is For Evaluation Of: TMP451
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Series: TMP451
  • Brand: Texas Instruments
  • Interface Type: I2C, SPI
  • Product Type: Temperature Sensor Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TMP451EVM

TMP451EVM Specifications

TMP451EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensor.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 1.8 V, 3.3 V

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, SPI.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Temperature Sensor Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top