TPA2005D1EVM

Mfr. #: TPA2005D1EVM
Manufacturer: Texas Instruments
Description: Audio IC Development Tools TPA2005D1 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPA2005D1EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2005D1EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 5 V to 15 V operating supply voltage range Output power: 1.1 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.804096 oz of Unit Weight

TPA2005D1EVM Image

TPA2005D1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2005D1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA2005D1
  • Operating Supply Voltage: 5 V to 15 V
  • Output Power: 1.1 W
  • Series: TPA2005D1
  • Brand: Texas Instruments
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.804096 oz

TPA2005D1EVM

TPA2005D1EVM Specifications

TPA2005D1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: Is the cutoff frequency of the product Operating Supply Voltage?

    Q: Yes, the product's Operating Supply Voltage is indeed 5 V to 15 V

  • A: At what frequency does the Output Power?

    Q: The product Output Power is 1.1 W.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.804096 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top