TPA3003D2EVM

Mfr. #: TPA3003D2EVM
Manufacturer: Texas Instruments
Description: Audio IC Development Tools TPA3003D2 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPA3003D2EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA3003D2EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Audio Amplifier type. 8.5 V to 14 V operating supply voltage range Output power: 3 W Texas Instruments is a trusted brand for quality electronics Audio IC Development Tools product type 1 of 100 Development Tools as subcategory

TPA3003D2EVM Image

TPA3003D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA3003D2EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Audio IC Development Tools
  • RoHS: N
  • Type: Audio Amplifier
  • Tool Is For Evaluation Of: TPA3003D2
  • Operating Supply Voltage: 8.5 V to 14 V
  • Output Power: 3 W
  • Series: TPA3003D2
  • Brand: Texas Instruments
  • Operating Supply Current: 1.6 A
  • Product Type: Audio IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPA3003D2EVM

TPA3003D2EVM Specifications

TPA3003D2EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Type?

    Q: The product Type is Audio Amplifier.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 8.5 V to 14 V.

  • A: Is the cutoff frequency of the product Output Power?

    Q: Yes, the product's Output Power is indeed 3 W

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Audio IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top