TPS22968NQ1EVM

Mfr. #: TPS22968NQ1EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS22968NQ1EVM
Lifecycle: New from this manufacturer.
Datasheet: TPS22968NQ1EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22968NQ1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 800 mV to 5.5 V Input Voltage The AEC-Q100 Qualification Output current: 4 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.065299 oz of Unit Weight

TPS22968NQ1EVM Image

TPS22968NQ1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22968NQ1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22968N-Q1
  • Input Voltage: 800 mV to 5.5 V
  • Qualification: AEC-Q100
  • Description/Function: Dual channel load switch evaluation module
  • Output Current: 4 A
  • Series: TPS22968Q1/TPS22968NQ1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.065299 oz

TPS22968NQ1EVM

TPS22968NQ1EVM Specifications

TPS22968NQ1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Load Switches

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 800 mV to 5.5 V

  • A: At what frequency does the Qualification?

    Q: The product Qualification is AEC-Q100.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 4 A.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.065299 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top