TPS22968Q1EVM

Mfr. #: TPS22968Q1EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS22968-Q1 Eval Module
Lifecycle: New from this manufacturer.
Datasheet: TPS22968Q1EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22968Q1EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. 800 mV to 5.5 V Input Voltage The AEC-Q100 Qualification Bulk packaging for easy dispensing Output current: 4 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.065299 oz of Unit Weight

TPS22968Q1EVM Image

TPS22968Q1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22968Q1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS22968-Q1
  • Input Voltage: 800 mV to 5.5 V
  • Qualification: AEC-Q100
  • Packaging: Bulk
  • Description/Function: TPS22968-Q1 evaluation module
  • Output Current: 4 A
  • Series: TPS22968Q1/TPS22968NQ1
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.065299 oz

TPS22968Q1EVM

TPS22968Q1EVM Specifications

TPS22968Q1EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Load Switches.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 800 mV to 5.5 V.

  • A: Is the cutoff frequency of the product Qualification?

    Q: Yes, the product's Qualification is indeed AEC-Q100

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 4 A

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.065299 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top