TPS22981EVM

Mfr. #: TPS22981EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS22981EVM
Lifecycle: New from this manufacturer.
Datasheet: TPS22981EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS22981EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 3.3 V to 18 V Input Voltage Texas Instruments is a trusted brand for quality electronics Compatible with TPS22981. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS22981EVM Image

TPS22981EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS22981EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: TPS22981
  • Input Voltage: 3.3 V to 18 V
  • Series: TPS22981
  • Brand: Texas Instruments
  • For Use With: TPS22981
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS22981EVM

TPS22981EVM Specifications

TPS22981EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Power Management Specialized.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 3.3 V to 18 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS22981.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top