TPS2378EVM-602

Mfr. #: TPS2378EVM-602
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS2378EVM-602
Lifecycle: New from this manufacturer.
Datasheet: TPS2378EVM-602 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2378EVM-602 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Over Ethernet type. 57 V Input Voltage Bulk packaging for easy dispensing Output current: 2.9 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 1.187861 oz of Unit Weight

TPS2378EVM-602 Image

TPS2378EVM-602

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2378EVM-602 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Over Ethernet
  • Tool Is For Evaluation Of: TPS2378
  • Input Voltage: 57 V
  • Packaging: Bulk
  • Description/Function: Evaluation of a forced four pair Universal Power Over Ethernet (UPOE)
  • Output Current: 2.9 A
  • Series: TPS2378
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 1.187861 oz

TPS2378EVM-602

TPS2378EVM-602 Specifications

TPS2378EVM-602 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Power Over Ethernet.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 57 V.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2.9 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 1.187861 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top