TPS2390EVM

Mfr. #: TPS2390EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools Simple -48V Hot Swap Contr EVM
Lifecycle: New from this manufacturer.
Datasheet: TPS2390EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2390EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Hot Swap Voltage Controllers type. - 48 V Input Voltage Dimensions of 81.9 mm x 56.8 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS2390EVM Image

TPS2390EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2390EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS2390
  • Input Voltage: - 48 V
  • Dimensions: 81.9 mm x 56.8 mm
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS2390EVM

TPS2390EVM Specifications

TPS2390EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Hot Swap Voltage Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is - 48 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 81.9 mm x 56.8 mm

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top