TPS24772EVM-685

Mfr. #: TPS24772EVM-685
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS24772 Eval Module
Lifecycle: New from this manufacturer.
Datasheet: TPS24772EVM-685 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS24772EVM-685 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Hot Swap Voltage Controllers type. 11 V to 13 V Input Voltage Bulk packaging for easy dispensing Output current: 110 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS24772. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.134400 oz of Unit Weight

TPS24772EVM-685 Image

TPS24772EVM-685

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS24772EVM-685 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Hot Swap Voltage Controllers
  • Tool Is For Evaluation Of: TPS24772
  • Input Voltage: 11 V to 13 V
  • Packaging: Bulk
  • Description/Function: Evaluation module for a high performance hot-swap controller
  • Output Current: 110 A
  • Series: TPS24772
  • Brand: Texas Instruments
  • For Use With: TPS24772
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.134400 oz

TPS24772EVM-685

TPS24772EVM-685 Specifications

TPS24772EVM-685 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Hot Swap Voltage Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 11 V to 13 V.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 110 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS24772.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.134400 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top