TPS2543EVM-064

Mfr. #: TPS2543EVM-064
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS2543 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPS2543EVM-064 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2543EVM-064 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Load Switches type. Texas Instruments is a trusted brand for quality electronics Interface Type: USB The product can operate at a maximum temperature of + 125 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 8.818490 oz of Unit Weight

TPS2543EVM-064 Image

TPS2543EVM-064

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2543EVM-064 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Load Switches
  • Tool Is For Evaluation Of: TPS2543
  • Series: TPS2543
  • Brand: Texas Instruments
  • Interface Type: USB
  • Maximum Operating Temperature: + 125 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 8.818490 oz

TPS2543EVM-064

TPS2543EVM-064 Specifications

TPS2543EVM-064 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Load Switches.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed USB

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 8.818490 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top