TPS25741EVM-802

Mfr. #: TPS25741EVM-802
Manufacturer: Texas Instruments
Description: Interface Development Tools TPS25741EVM-802 EVM
Lifecycle: New from this manufacturer.
Datasheet: TPS25741EVM-802 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS25741EVM-802 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB type. Texas Instruments is a trusted brand for quality electronics 22 V to 28 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.102851 oz of Unit Weight

TPS25741EVM-802 Image

TPS25741EVM-802

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS25741EVM-802 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: USB
  • Tool Is For Evaluation Of: TPS25741
  • Series: TPS25741
  • Brand: Texas Instruments
  • Operating Supply Voltage: 22 V to 28 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.102851 oz

TPS25741EVM-802

TPS25741EVM-802 Specifications

TPS25741EVM-802 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is USB.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 22 V to 28 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.102851 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top