TPS2HA08AQ1EVM

Mfr. #: TPS2HA08AQ1EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools
Lifecycle: New from this manufacturer.
Datasheet: TPS2HA08AQ1EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2HA08AQ1EVM Overview

This product is manufactured by Texas Instruments. The AEC-Q100 Qualification Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SIMPLE SWITCHER is Blue Gecko.

TPS2HA08AQ1EVM Image

TPS2HA08AQ1EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2HA08AQ1EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • Qualification: AEC-Q100
  • Series: TPS2H160
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SIMPLE SWITCHER

TPS2HA08AQ1EVM

TPS2HA08AQ1EVM Specifications

TPS2HA08AQ1EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Qualification of the product?

    Q: The Qualification of the product is AEC-Q100.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SIMPLE SWITCHER.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top