TPS40200EVM-001

Mfr. #: TPS40200EVM-001
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools Non-Sync Buck Contr Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPS40200EVM-001 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS40200EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Switching Controllers type. 12 V Input Voltage Output Voltage is 3.3 V Dimensions of 53.8 mm x 35.6 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.197230 oz of Unit Weight

TPS40200EVM-001 Image

TPS40200EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS40200EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Switching Controllers
  • Tool Is For Evaluation Of: TPS40200
  • Input Voltage: 12 V
  • Output Voltage: 3.3 V
  • Dimensions: 53.8 mm x 35.6 mm
  • Series: TPS40200
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.197230 oz

TPS40200EVM-001

TPS40200EVM-001 Specifications

TPS40200EVM-001 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Switching Controllers.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 53.8 mm x 35.6 mm

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.197230 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top