TPS51100EVM-001

Mfr. #: TPS51100EVM-001
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools tps51100evm-001
Lifecycle: New from this manufacturer.
Datasheet: TPS51100EVM-001 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS51100EVM-001 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 4.75 V to 5.25 V Input Voltage Dimensions of 76.2 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS51100EVM-001 Image

TPS51100EVM-001

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS51100EVM-001 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS51100
  • Input Voltage: 4.75 V to 5.25 V
  • Dimensions: 76.2 mm x 76.2 mm
  • Series: TPS51100
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS51100EVM-001

TPS51100EVM-001 Specifications

TPS51100EVM-001 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.75 V to 5.25 V

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 76.2 mm x 76.2 mm.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top