TPS53515EVM-587

Mfr. #: TPS53515EVM-587
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS53515 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: TPS53515EVM-587 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS53515EVM-587 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 12 V Input Voltage Output Voltage is 1.2 V Output current: 12 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS53515. The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko. 1. 0.151319 oz of Unit Weight

TPS53515EVM-587 Image

TPS53515EVM-587

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS53515EVM-587 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS53515
  • Input Voltage: 12 V
  • Output Voltage: 1.2 V
  • Description/Function: Demonstrates the TPS53515 device in a typical low voltage application
  • Output Current: 12 A
  • Series: TPS53515
  • Brand: Texas Instruments
  • For Use With: TPS53515
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT
  • Unit Weight: 0.151319 oz

TPS53515EVM-587

TPS53515EVM-587 Specifications

TPS53515EVM-587 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 12 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.2 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 12 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS53515.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 85 C.

  • A: Is the cutoff frequency of the product Minimum Operating Temperature?

    Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Tradename?

    Q: Yes, the product's Tradename is indeed SWIFT

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.151319 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top