| Mfr. #: | TPS5403EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools EVM for TPS5403DR |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | TPS5403EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 28 V Input Voltage Output Voltage is 3.3 V Output current: 1.7 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.705479 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS5403EVM Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Voltage Regulators - Switching Regulators.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 4.5 V to 28 V.
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 3.3 V
A: Is the cutoff frequency of the product Output Current?
Q: Yes, the product's Output Current is indeed 1.7 A
A: Is the cutoff frequency of the product Brand?
Q: Yes, the product's Brand is indeed Texas Instruments
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools
A: Is the cutoff frequency of the product Unit Weight?
Q: Yes, the product's Unit Weight is indeed 0.705479 oz