TPS54228EVM-686

Mfr. #: TPS54228EVM-686
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS54228 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPS54228EVM-686 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54228EVM-686 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS54228EVM-686 Image

TPS54228EVM-686

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54228EVM-686 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS54228
  • Series: TPS54228
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS54228EVM-686

TPS54228EVM-686 Specifications

TPS54228EVM-686 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top