TPS5430EVM-173F

Mfr. #: TPS5430EVM-173F
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools
Lifecycle: New from this manufacturer.
Datasheet: TPS5430EVM-173F Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS5430EVM-173F Overview

This product is manufactured by Texas Instruments. Evaluation Boards Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS5430EVM-173F Image

TPS5430EVM-173F

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS5430EVM-173F Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • Product: Evaluation Boards
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS5430EVM-173F

TPS5430EVM-173F Specifications

TPS5430EVM-173F FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top