TPS54383EVM

Mfr. #: TPS54383EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS54383EVM
Lifecycle: New from this manufacturer.
Datasheet: TPS54383EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54383EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 12 V Input Voltage Output Voltage is 5 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

TPS54383EVM Image

TPS54383EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54383EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS54383
  • Input Voltage: 12 V
  • Output Voltage: 5 V
  • Series: TPS54383
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT

TPS54383EVM

TPS54383EVM Specifications

TPS54383EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 12 V

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SWIFT.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top