| Mfr. #: | TPS543C20EVM-054 |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools TPS543C20 1-PHASE EVALUATION MODULE |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | TPS543C20EVM-054 Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 12 V Input Voltage Output Voltage is 0.9 V Output current: 40 A Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS543C20EVM-054 Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Voltage Regulators - Switching Regulators.
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 12 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 0.9 V
A: At what frequency does the Output Current?
Q: The product Output Current is 40 A.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 85 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is 0 C.
A: What is the Product Type of the product?
Q: The Product Type of the product is Power Management IC Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools