TPS562201EVM-715

Mfr. #: TPS562201EVM-715
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS562201EVM-715
Lifecycle: New from this manufacturer.
Datasheet: TPS562201EVM-715 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS562201EVM-715 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 17 V Input Voltage Output Voltage is 1.05 V Output current: 0 A to 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory The product's SWIFT is Blue Gecko.

TPS562201EVM-715 Image

TPS562201EVM-715

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS562201EVM-715 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS562201
  • Input Voltage: 4.5 V to 17 V
  • Output Voltage: 1.05 V
  • Output Current: 0 A to 2 A
  • Series: TPS562201
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Tradename: SWIFT

TPS562201EVM-715

TPS562201EVM-715 Specifications

TPS562201EVM-715 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.5 V to 17 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.05 V.

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 0 A to 2 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

  • A: What is the Tradename of the product?

    Q: The Tradename of the product is SWIFT.

12 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top