TPS562210EVM-663

Mfr. #: TPS562210EVM-663
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS562210 17V Input SOT-23 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPS562210EVM-663 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS562210EVM-663 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 17 V Input Voltage Output Voltage is 1.05 V Output current: 0 A to 2 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS562210EVM-663 Image

TPS562210EVM-663

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS562210EVM-663 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS562210
  • Input Voltage: 4.5 V to 17 V
  • Output Voltage: 1.05 V
  • Output Current: 0 A to 2 A
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS562210EVM-663

TPS562210EVM-663 Specifications

TPS562210EVM-663 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Voltage Regulators - Switching Regulators.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 4.5 V to 17 V.

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 1.05 V

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 0 A to 2 A.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top