TPS60120EVM-174

Mfr. #: TPS60120EVM-174
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools batt Powed Dual Out- put EVM for DSP's
Lifecycle: New from this manufacturer.
Datasheet: TPS60120EVM-174 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS60120EVM-174 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Charge Pumps type. 1.8 V to 3.6 V Input Voltage Output Voltage is 3.3 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS60120EVM-174 Image

TPS60120EVM-174

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS60120EVM-174 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Charge Pumps
  • Tool Is For Evaluation Of: TPS60120
  • Input Voltage: 1.8 V to 3.6 V
  • Output Voltage: 3.3 V
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS60120EVM-174

TPS60120EVM-174 Specifications

TPS60120EVM-174 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Charge Pumps

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 1.8 V to 3.6 V.

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top