TPS60130EVM-143

Mfr. #: TPS60130EVM-143
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools 3 batt cells/1 Li-Ion cell
Lifecycle: New from this manufacturer.
Datasheet: TPS60130EVM-143 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS60130EVM-143 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Charge Pumps type. 2.7 V to 5.4 V Input Voltage Output Voltage is 5 V Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS60130EVM-143 Image

TPS60130EVM-143

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS60130EVM-143 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Charge Pumps
  • Tool Is For Evaluation Of: TPS60130
  • Input Voltage: 2.7 V to 5.4 V
  • Output Voltage: 5 V
  • Series: TPS60130
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS60130EVM-143

TPS60130EVM-143 Specifications

TPS60130EVM-143 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Charge Pumps.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.7 V to 5.4 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top