| Mfr. #: | TPS61158EVM-565 |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | LED Lighting Development Tools TPS61158 EVAL MOD |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | TPS61158EVM-565 Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.052241 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61158EVM-565 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Product Type?
Q: The product Product Type is LED Lighting Development Tools.
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.052241 oz.