TPS61160EVM-243

Mfr. #: TPS61160EVM-243
Manufacturer: Texas Instruments
Description: LED Lighting Development Tools TPS61160EVM-243 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPS61160EVM-243 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61160EVM-243 Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with White LEDs. This product's TPS61160 is an ARM Cortex M3. 3 V to 18 V operating supply voltage range Output current: 20 mA Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.016069 oz of Unit Weight

TPS61160EVM-243 Image

TPS61160EVM-243

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61160EVM-243 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • For Use With: White LEDs
  • Core: TPS61160
  • Operating Supply Voltage: 3 V to 18 V
  • Series: TPS61160
  • Description/Function: Drives 6 or 10 WLEDs in series
  • Output Current: 20 mA
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.016069 oz

TPS61160EVM-243

TPS61160EVM-243 Specifications

TPS61160EVM-243 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed White LEDs

  • A: What is the Core of the product?

    Q: The Core of the product is TPS61160.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3 V to 18 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 20 mA.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is LED Lighting Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: Is the cutoff frequency of the product Unit Weight?

    Q: Yes, the product's Unit Weight is indeed 0.016069 oz

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top