TPS61169EVM

Mfr. #: TPS61169EVM
Manufacturer: Texas Instruments
Description: LED Lighting Development Tools TPS61169EVM WLED Dri Evaluation Board
Lifecycle: New from this manufacturer.
Datasheet: TPS61169EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS61169EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.047188 oz of Unit Weight

TPS61169EVM Image

TPS61169EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS61169EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: N/A
  • Product: Evaluation Boards
  • Series: TPS61169
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.047188 oz

TPS61169EVM

TPS61169EVM Specifications

TPS61169EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed LED Lighting Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.047188 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top