TPS62050EVM-234

Mfr. #: TPS62050EVM-234
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS62050EVM-234
Lifecycle: New from this manufacturer.
Datasheet: TPS62050EVM-234 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS62050EVM-234 Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Voltage Regulators - Switching Regulators type. 2.7 V to 10 V Input Voltage Output Voltage is 3.3 V Dimensions of 40.6 mm x 31.9 mm Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS62050EVM-234 Image

TPS62050EVM-234

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS62050EVM-234 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS62050
  • Input Voltage: 2.7 V to 10 V
  • Output Voltage: 3.3 V
  • Dimensions: 40.6 mm x 31.9 mm
  • Series: TPS62050
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS62050EVM-234

TPS62050EVM-234 Specifications

TPS62050EVM-234 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 2.7 V to 10 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 3.3 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 40.6 mm x 31.9 mm.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top