TPS65218EVM-100

Mfr. #: TPS65218EVM-100
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS65218 Evaluation Module
Lifecycle: New from this manufacturer.
Datasheet: TPS65218EVM-100 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65218EVM-100 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Power Management Specialized type. 2.7 V to 5.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Interface Type: I2C, USB Compatible with TPS65218. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.146887 oz of Unit Weight

TPS65218EVM-100 Image

TPS65218EVM-100

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65218EVM-100 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: TPS65218
  • Input Voltage: 2.7 V to 5.5 V
  • Series: TPS65218
  • Brand: Texas Instruments
  • Interface Type: I2C, USB
  • For Use With: TPS65218
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.146887 oz

TPS65218EVM-100

TPS65218EVM-100 Specifications

TPS65218EVM-100 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Power Management Specialized.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 2.7 V to 5.5 V.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is I2C, USB.

  • A: Is the cutoff frequency of the product For Use With?

    Q: Yes, the product's For Use With is indeed TPS65218

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.146887 oz.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top