TPS65235EVM-694

Mfr. #: TPS65235EVM-694
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS65235EVM-694
Lifecycle: New from this manufacturer.
Datasheet: TPS65235EVM-694 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65235EVM-694 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 4.5 V to 16 V Input Voltage Output Voltage is 13 V, 18 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65235EVM-694 Image

TPS65235EVM-694

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65235EVM-694 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS65235
  • Input Voltage: 4.5 V to 16 V
  • Output Voltage: 13 V, 18 V
  • Description/Function: TPS65235 LNB voltage regulator with I2C interface
  • Output Current: 1 A
  • Series: TPS65235
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65235EVM-694

TPS65235EVM-694 Specifications

TPS65235EVM-694 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.5 V to 16 V

  • A: Is the cutoff frequency of the product Output Voltage?

    Q: Yes, the product's Output Voltage is indeed 13 V, 18 V

  • A: What is the Output Current of the product?

    Q: The Output Current of the product is 1 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top