TPS65288EVM

Mfr. #: TPS65288EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS65288 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: TPS65288EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65288EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 4.5 V to 18 V Input Voltage Output Voltage is 1.2 V to 3.3 V Output current: 2 A, 3 A Texas Instruments is a trusted brand for quality electronics Compatible with TPS65288. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65288EVM Image

TPS65288EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65288EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: Y
  • Product: Evaluation Boards
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65288
  • Input Voltage: 4.5 V to 18 V
  • Output Voltage: 1.2 V to 3.3 V
  • Description/Function: Designed to provide access to the features of the TPS65288
  • Output Current: 2 A, 3 A
  • Series: TPS65288
  • Brand: Texas Instruments
  • For Use With: TPS65288
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65288EVM

TPS65288EVM Specifications

TPS65288EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 4.5 V to 18 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.2 V to 3.3 V.

  • A: At what frequency does the Output Current?

    Q: The product Output Current is 2 A, 3 A.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: At what frequency does the For Use With?

    Q: The product For Use With is TPS65288.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top