| Mfr. #: | TPS65381EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools TPS65381 EVAL MOD |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | TPS65381EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 5.8 V to 36 V Input Voltage Output Voltage is 9.5 V Texas Instruments is a trusted brand for quality electronics Interface Type: SPI The product can operate at a maximum temperature of + 150 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65381EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed PMIC Solutions
A: Is the cutoff frequency of the product Input Voltage?
Q: Yes, the product's Input Voltage is indeed 5.8 V to 36 V
A: Is the cutoff frequency of the product Output Voltage?
Q: Yes, the product's Output Voltage is indeed 9.5 V
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: At what frequency does the Interface Type?
Q: The product Interface Type is SPI.
A: What is the Maximum Operating Temperature of the product?
Q: The Maximum Operating Temperature of the product is + 150 C.
A: Is the cutoff frequency of the product Minimum Operating Temperature?
Q: Yes, the product's Minimum Operating Temperature is indeed - 40 C
A: At what frequency does the Product Type?
Q: The product Product Type is Power Management IC Development Tools.
A: At what frequency does the Factory Pack Quantity?
Q: The product Factory Pack Quantity is 1.
A: Is the cutoff frequency of the product Subcategory?
Q: Yes, the product's Subcategory is indeed Development Tools