TPS65680EVM

Mfr. #: TPS65680EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools EVM FOR DEVICE TPS65680RSN
Lifecycle: New from this manufacturer.
Datasheet: TPS65680EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65680EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the Power Supply Controllers type. 2.7 V to 5.5 V Input Voltage Bulk packaging for easy dispensing Texas Instruments is a trusted brand for quality electronics Compatible with Large Format LCD display. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65680EVM Image

TPS65680EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65680EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: Power Supply Controllers
  • Tool Is For Evaluation Of: TPS65680
  • Input Voltage: 2.7 V to 5.5 V
  • Packaging: Bulk
  • Description/Function: Programmable Level Shifter
  • Series: TPS65680
  • Brand: Texas Instruments
  • For Use With: Large Format LCD display
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65680EVM

TPS65680EVM Specifications

TPS65680EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Power Supply Controllers.

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 2.7 V to 5.5 V

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is Large Format LCD display.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

14 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top