TPS65820EVM

Mfr. #: TPS65820EVM
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS65820EVM
Lifecycle: New from this manufacturer.
Datasheet: TPS65820EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS65820EVM Overview

This product is manufactured by Texas Instruments. Evaluation Boards This device belongs to the PMIC Solutions type. 5 V Input Voltage Dimensions of 101.6 mm x 76.2 mm Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 85 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS65820EVM Image

TPS65820EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS65820EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Boards
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65820
  • Input Voltage: 5 V
  • Dimensions: 101.6 mm x 76.2 mm
  • Series: TPS65820
  • Brand: Texas Instruments
  • Maximum Operating Temperature: + 85 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS65820EVM

TPS65820EVM Specifications

TPS65820EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 5 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 101.6 mm x 76.2 mm.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: At what frequency does the Maximum Operating Temperature?

    Q: The product Maximum Operating Temperature is + 85 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top