TPS659101EVM-583

Mfr. #: TPS659101EVM-583
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS659101 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: TPS659101EVM-583 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS659101EVM-583 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the PMIC Solutions type. 5 V Input Voltage Output Voltage is 0.6 V to 5 V Dimensions of 101.6 mm x 101.6 mm Output current: 50 mA to 1.5 A Texas Instruments is a trusted brand for quality electronics Interface Type: I2C Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory

TPS659101EVM-583 Image

TPS659101EVM-583

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS659101EVM-583 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • Type: PMIC Solutions
  • Tool Is For Evaluation Of: TPS65910
  • Input Voltage: 5 V
  • Output Voltage: 0.6 V to 5 V
  • Description/Function: Evaluation Module for TPS659101 Integrated Power Management IC w/ 4 DC/DCs, 8 LDOs
  • Dimensions: 101.6 mm x 101.6 mm
  • Output Current: 50 mA to 1.5 A
  • Series: TPS659101
  • Brand: Texas Instruments
  • Interface Type: I2C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TPS659101EVM-583

TPS659101EVM-583 Specifications

TPS659101EVM-583 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is PMIC Solutions.

  • A: What is the Input Voltage of the product?

    Q: The Input Voltage of the product is 5 V.

  • A: At what frequency does the Output Voltage?

    Q: The product Output Voltage is 0.6 V to 5 V.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 101.6 mm x 101.6 mm.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 50 mA to 1.5 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Interface Type?

    Q: Yes, the product's Interface Type is indeed I2C

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top