TPS82150EVM-720

Mfr. #: TPS82150EVM-720
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools TPS82150EVM-720
Lifecycle: New from this manufacturer.
Datasheet: TPS82150EVM-720 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS82150EVM-720 Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Voltage Regulators - Switching Regulators type. 3 V to 17 V Input Voltage Output Voltage is 1.8 V Output current: 1 A Texas Instruments is a trusted brand for quality electronics Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.045125 oz of Unit Weight

TPS82150EVM-720 Image

TPS82150EVM-720

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS82150EVM-720 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Type: Voltage Regulators - Switching Regulators
  • Tool Is For Evaluation Of: TPS82150
  • Input Voltage: 3 V to 17 V
  • Output Voltage: 1.8 V
  • Description/Function: Evaluates the TPS82150 MicroSIP power module
  • Output Current: 1 A
  • Series: TPS82130/40/50
  • Brand: Texas Instruments
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.045125 oz

TPS82150EVM-720

TPS82150EVM-720 Specifications

TPS82150EVM-720 FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage Regulators - Switching Regulators

  • A: Is the cutoff frequency of the product Input Voltage?

    Q: Yes, the product's Input Voltage is indeed 3 V to 17 V

  • A: What is the Output Voltage of the product?

    Q: The Output Voltage of the product is 1.8 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 1 A

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Power Management IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: At what frequency does the Unit Weight?

    Q: The product Unit Weight is 0.045125 oz.

38 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top