| Mfr. #: | TRF2436EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | RF Development Tools DUAL BAND RF FRONT END |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | TRF2436EVM Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the RF Front End type. Frequency range: 2.4 GHz 3.3 V operating supply voltage range Dimensions of 91.4 mm x 91.4 mm Texas Instruments is a trusted brand for quality electronics RF Development Tools product type 1 of 100 Development Tools as subcategory

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF2436EVM Specifications
A: At what frequency does the Manufacturer?
Q: The product Manufacturer is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is RF Front End.
A: Is the cutoff frequency of the product Frequency?
Q: Yes, the product's Frequency is indeed 2.4 GHz
A: At what frequency does the Operating Supply Voltage?
Q: The product Operating Supply Voltage is 3.3 V.
A: Is the cutoff frequency of the product Dimensions?
Q: Yes, the product's Dimensions is indeed 91.4 mm x 91.4 mm
A: At what frequency does the Brand?
Q: The product Brand is Texas Instruments.
A: What is the Product Type of the product?
Q: The Product Type of the product is RF Development Tools.
A: Is the cutoff frequency of the product Factory Pack Quantity?
Q: Yes, the product's Factory Pack Quantity is indeed 1
A: What is the Subcategory of the product?
Q: The Subcategory of the product is Development Tools.