TS3USB3031EVM

Mfr. #: TS3USB3031EVM
Manufacturer: Texas Instruments
Description: Switch IC Development Tools TS3USB3031 EVAL MOD
Lifecycle: New from this manufacturer.
Datasheet: TS3USB3031EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TS3USB3031EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the Multiplexer / Demultiplexer Switches type. Interface Type: USB Texas Instruments is a trusted brand for quality electronics 3.3 V operating supply voltage range Switch IC Development Tools product type 1 of 100 Development Tools as subcategory

TS3USB3031EVM Image

TS3USB3031EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TS3USB3031EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Switch IC Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: Multiplexer / Demultiplexer Switches
  • Tool Is For Evaluation Of: TS3USB3031
  • Interface Type: USB
  • Series: TS3USB3031
  • Brand: Texas Instruments
  • Operating Supply Voltage: 3.3 V
  • Product Type: Switch IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TS3USB3031EVM

TS3USB3031EVM Specifications

TS3USB3031EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Multiplexer / Demultiplexer Switches.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: At what frequency does the Operating Supply Voltage?

    Q: The product Operating Supply Voltage is 3.3 V.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Switch IC Development Tools.

  • A: What is the Factory Pack Quantity of the product?

    Q: The Factory Pack Quantity of the product is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top