TSC2007EVM

Mfr. #: TSC2007EVM
Manufacturer: Texas Instruments
Description: Display Development Tools TSC2007 Evaluation Module
Lifecycle: New from this manufacturer.
Datasheet: TSC2007EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSC2007EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules 1.8 V, 3.3 V operating supply voltage range Interface Type: 4-Wire, USB Texas Instruments is a trusted brand for quality electronics Compatible with USB-MODEVM. Display Development Tools product type 1 of 100 Development Tools as subcategory

TSC2007EVM Image

TSC2007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSC2007EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Display Development Tools
  • RoHS: N
  • Product: Evaluation Modules
  • Tool Is For Evaluation Of: TSC2007
  • Operating Supply Voltage: 1.8 V, 3.3 V
  • Interface Type: 4-Wire, USB
  • Series: TSC2007
  • Brand: Texas Instruments
  • For Use With: USB-MODEVM
  • Product Type: Display Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TSC2007EVM

TSC2007EVM Specifications

TSC2007EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 1.8 V, 3.3 V.

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is 4-Wire, USB.

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is USB-MODEVM.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Display Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top