TUSB7320EVM

Mfr. #: TUSB7320EVM
Manufacturer: Texas Instruments
Description: Interface Development Tools 2-port SuperSpd USB xHCI PCIe Card Ref
Lifecycle: New from this manufacturer.
Datasheet: TUSB7320EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB7320EVM Overview

This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the USB type. Dimensions of 4.38 in x 2.57 in Texas Instruments is a trusted brand for quality electronics Interface Type: USB 5 V operating supply voltage range Interface Development Tools product type 1 of 100 Development Tools as subcategory

TUSB7320EVM Image

TUSB7320EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB7320EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: Y
  • Product: Evaluation Modules
  • Type: USB
  • Tool Is For Evaluation Of: TUSB7320
  • Description/Function: TUSB7320EVM board is a free-standing reference design for a two-port PCIe-based SuperSpeed USB (USB 3.0) Extensible Host Controller (xHCI)
  • Dimensions: 4.38 in x 2.57 in
  • Series: TUSB7320
  • Brand: Texas Instruments
  • Interface Type: USB
  • Operating Supply Voltage: 5 V
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TUSB7320EVM

TUSB7320EVM Specifications

TUSB7320EVM FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is USB.

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 4.38 in x 2.57 in.

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: What is the Interface Type of the product?

    Q: The Interface Type of the product is USB.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 5 V.

  • A: At what frequency does the Product Type?

    Q: The product Product Type is Interface Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: At what frequency does the Subcategory?

    Q: The product Subcategory is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top