TUSB8040EVM

Mfr. #: TUSB8040EVM
Manufacturer: Texas Instruments
Description: Interface Development Tools SuperSpd USB Hub Ref Design
Lifecycle: New from this manufacturer.
Datasheet: TUSB8040EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TUSB8040EVM Overview

This product is manufactured by Texas Instruments. Texas Instruments is a trusted brand for quality electronics Interface Development Tools product type 1 of 100 Development Tools as subcategory

TUSB8040EVM Image

TUSB8040EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TUSB8040EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Interface Development Tools
  • RoHS: E
  • Brand: Texas Instruments
  • Product Type: Interface Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

TUSB8040EVM

TUSB8040EVM Specifications

TUSB8040EVM FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Interface Development Tools.

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top