UCC24610EVM-693

Mfr. #: UCC24610EVM-693
Manufacturer: Texas Instruments
Description: Power Management IC Development Tools Diode Replacement Demo Card
Lifecycle: New from this manufacturer.
Datasheet: UCC24610EVM-693 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC24610EVM-693 Overview

This product is manufactured by Texas Instruments. Demonstration Boards This device belongs to the Power Management Specialized type. 4.5 V to 6.5 V Input Voltage Texas Instruments is a trusted brand for quality electronics Compatible with UCC24610. The product can operate at a maximum temperature of + 125 C. The minimum operating temperature of this product is - 40 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.533297 oz of Unit Weight

UCC24610EVM-693 Image

UCC24610EVM-693

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC24610EVM-693 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Power Management IC Development Tools
  • RoHS: E
  • Product: Demonstration Boards
  • Type: Power Management Specialized
  • Tool Is For Evaluation Of: UCC24610
  • Input Voltage: 4.5 V to 6.5 V
  • Description/Function: Diode replacement demonstration card for UCC24610 secondary side synchronous rectifier controller
  • Series: UCC24610
  • Brand: Texas Instruments
  • For Use With: UCC24610
  • Maximum Operating Temperature: + 125 C
  • Minimum Operating Temperature: - 40 C
  • Product Type: Power Management IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools
  • Unit Weight: 0.533297 oz

UCC24610EVM-693

UCC24610EVM-693 Specifications

UCC24610EVM-693 FAQ
  • A: Is the cutoff frequency of the product Manufacturer?

    Q: Yes, the product's Manufacturer is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Demonstration Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Power Management Specialized

  • A: At what frequency does the Input Voltage?

    Q: The product Input Voltage is 4.5 V to 6.5 V.

  • A: At what frequency does the Brand?

    Q: The product Brand is Texas Instruments.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is UCC24610.

  • A: What is the Maximum Operating Temperature of the product?

    Q: The Maximum Operating Temperature of the product is + 125 C.

  • A: What is the Minimum Operating Temperature of the product?

    Q: The Minimum Operating Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed Power Management IC Development Tools

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: What is the Subcategory of the product?

    Q: The Subcategory of the product is Development Tools.

  • A: What is the Unit Weight of the product?

    Q: The Unit Weight of the product is 0.533297 oz.

11 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top