UCC25710EVM-654

Mfr. #: UCC25710EVM-654
Manufacturer: Texas Instruments
Description: LED Lighting Development Tools UCC25710EVM-654
Lifecycle: New from this manufacturer.
Datasheet: UCC25710EVM-654 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
UCC25710EVM-654 Overview

This product is manufactured by Texas Instruments. Evaluation Modules Compatible with UCC25710. This product's UCC25710 is an ARM Cortex M3. 390 V operating supply voltage range Output current: 250 mA Texas Instruments is a trusted brand for quality electronics LED Lighting Development Tools product type 1 of 100 Development Tools as subcategory

UCC25710EVM-654 Image

UCC25710EVM-654

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC25710EVM-654 Specifications
  • Manufacturer: Texas Instruments
  • Product Category: LED Lighting Development Tools
  • RoHS: E
  • Product: Evaluation Modules
  • For Use With: UCC25710
  • Core: UCC25710
  • Operating Supply Voltage: 390 V
  • Series: UCC25710
  • Output Current: 250 mA
  • Brand: Texas Instruments
  • Product Type: LED Lighting Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

UCC25710EVM-654

UCC25710EVM-654 Specifications

UCC25710EVM-654 FAQ
  • A: What is the Manufacturer of the product?

    Q: The Manufacturer of the product is Texas Instruments.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the For Use With of the product?

    Q: The For Use With of the product is UCC25710.

  • A: At what frequency does the Core?

    Q: The product Core is UCC25710.

  • A: What is the Operating Supply Voltage of the product?

    Q: The Operating Supply Voltage of the product is 390 V.

  • A: Is the cutoff frequency of the product Output Current?

    Q: Yes, the product's Output Current is indeed 250 mA

  • A: Is the cutoff frequency of the product Brand?

    Q: Yes, the product's Brand is indeed Texas Instruments

  • A: Is the cutoff frequency of the product Product Type?

    Q: Yes, the product's Product Type is indeed LED Lighting Development Tools

  • A: Is the cutoff frequency of the product Factory Pack Quantity?

    Q: Yes, the product's Factory Pack Quantity is indeed 1

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top