| Mfr. #: | UCC28880EVM-615 |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | Power Management IC Development Tools UCC0880 Eval Mod |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | UCC28880EVM-615 Datasheet |


This product is manufactured by Texas Instruments. Evaluation Modules This device belongs to the AC/DC Converters type. 115 VAC/230 VAC Input Voltage Output Voltage is 12.5 V Dimensions of 5 in x 3.5 in x 0.75 in Output current: 100 mA Texas Instruments is a trusted brand for quality electronics The product can operate at a maximum temperature of + 40 C. The minimum operating temperature of this product is 0 C. Power Management IC Development Tools product type 1 of 100 Development Tools as subcategory 1. 0.402174 oz of Unit Weight

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

UCC28880EVM-615 Specifications
A: What is the Manufacturer of the product?
Q: The Manufacturer of the product is Texas Instruments.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is AC/DC Converters.
A: At what frequency does the Input Voltage?
Q: The product Input Voltage is 115 VAC/230 VAC.
A: At what frequency does the Output Voltage?
Q: The product Output Voltage is 12.5 V.
A: What is the Dimensions of the product?
Q: The Dimensions of the product is 5 in x 3.5 in x 0.75 in.
A: At what frequency does the Output Current?
Q: The product Output Current is 100 mA.
A: What is the Brand of the product?
Q: The Brand of the product is Texas Instruments.
A: At what frequency does the Maximum Operating Temperature?
Q: The product Maximum Operating Temperature is + 40 C.
A: What is the Minimum Operating Temperature of the product?
Q: The Minimum Operating Temperature of the product is 0 C.
A: Is the cutoff frequency of the product Product Type?
Q: Yes, the product's Product Type is indeed Power Management IC Development Tools
A: What is the Factory Pack Quantity of the product?
Q: The Factory Pack Quantity of the product is 1.
A: At what frequency does the Subcategory?
Q: The product Subcategory is Development Tools.
A: At what frequency does the Unit Weight?
Q: The product Unit Weight is 0.402174 oz.