XTR108EVM

Mfr. #: XTR108EVM
Manufacturer: Texas Instruments
Description: Data Conversion IC Development Tools XTR108 Eval Mod
Lifecycle: New from this manufacturer.
Datasheet: XTR108EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
XTR108EVM Overview

This product is manufactured by Texas Instruments. This device belongs to the Voltage to Current Converters type. Texas Instruments is a trusted brand for quality electronics Data Conversion IC Development Tools product type 1 of 100 Development Tools as subcategory

XTR108EVM Image

XTR108EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

XTR108EVM Specifications
  • Manufacturer: Texas Instruments
  • Product Category: Data Conversion IC Development Tools
  • RoHS: N
  • Type: Voltage to Current Converters
  • Tool Is For Evaluation Of: XTR108
  • Brand: Texas Instruments
  • Product Type: Data Conversion IC Development Tools
  • Factory Pack Quantity: 1
  • Subcategory: Development Tools

XTR108EVM

XTR108EVM Specifications

XTR108EVM FAQ
  • A: At what frequency does the Manufacturer?

    Q: The product Manufacturer is Texas Instruments.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Voltage to Current Converters

  • A: What is the Brand of the product?

    Q: The Brand of the product is Texas Instruments.

  • A: What is the Product Type of the product?

    Q: The Product Type of the product is Data Conversion IC Development Tools.

  • A: At what frequency does the Factory Pack Quantity?

    Q: The product Factory Pack Quantity is 1.

  • A: Is the cutoff frequency of the product Subcategory?

    Q: Yes, the product's Subcategory is indeed Development Tools

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
Top