| Mfr. #: | ADC3241EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE ADC3241 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADC3241EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 25M. Data-Interface: LVDS - Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC3241 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3241 evaluation module. This tool is designed for the ADC3241. Serial LVDS interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3241EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 25M.
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed LVDS - Serial
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 14.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 2.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 2 Vpp.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADC3241.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 1.8 V.
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed ADC3241 evaluation module
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADC3241.
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is Serial LVDS.