| Mfr. #: | ADC3243EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE ADC3243 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADC3243EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 80M. Data-Interface: LVDS - Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC3243 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3243 evaluation module. This tool is designed for the ADC3243. Serial LVDS interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3243EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: Is the cutoff frequency of the product Product?
Q: Yes, the product's Product is indeed Evaluation Modules
A: At what frequency does the Type?
Q: The product Type is ADC.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 80M.
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed LVDS - Serial
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 14.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 2.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 2 Vpp.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed ADC3243
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V
A: Is the cutoff frequency of the product Description-Function?
Q: Yes, the product's Description-Function is indeed ADC3243 evaluation module
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADC3243.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is Serial LVDS.